top of page

Shining Windows

01604 263189

Our Projects

Add paragraph text. Click “Edit Text” to update the font, size and more. 

NN18

The Clay-Stain Protocol: Red soil management for the southern build.

NN2

The Northern Slope Protocol: Weatherproofing for the wind-exposed high ground.

NN12

The A5 Corridor Protocol: Traffic film management for the Watling Street belt.

NN1

The Heritage Protocol: Low-pressure steam cleaning for the historic County Town core.

NN16

The Texture Protocol: Steam for brick, hydrophobic for glass.

NN9

The Exposed Hilltop Protocol: Weather protection for the Nene uplands.

NN3

The Biomass Protocol: Managing leaf-fall and algae in the garden district.

NN7

The Porous Stone Protocol: Non-abrasive cleaning for the limestone belt.

NN4

The Hydrocarbon Protocol: Traffic film removal for the M1/A45 corridor.

NN14

The River & Ridge Protocol: Managing humidity extremes in the Nene/Ise valleys.

NN29

The Border Protocol: Managing agricultural dust on the county fringe.

NN8

The Red-Dust Protocol: Iron oxide removal for the sloping town

NN10

The Dual-Era Protocol: Steam for the old, pure water for the new.

NN5

he Material-Hybrid Protocol: Zinc, timber & stone care for the diverse west.

NN13

The Honey-Stone Protocol: Gentle restoration for the Cotswold fringe.

NN17

The Oxidation Protocol: Removing 'chalking' from industrial cladding.

NN11

The Logistics Halo Protocol: Fallout removal for the A45/M1 hub.

NN6

The Ironstone Ridge Protocol: Ferrous stain management for the rural stone belt.

NN15

The Food-Corridor Protocol: Bio-film removal near the Weetabix processing zone.

bottom of page