top of page

Shining Windows

01604 263189

Our Projects

Add paragraph text. Click “Edit Text” to update the font, size and more. 

MK42

The Expansion Protocol: Construction dust removal for Wixams and Shortstown.

MK19

The Spire Protocol: High-reach access for the tall village architecture.

MK13

The Mature Suburb Protocol: Moss management for the leafy northern grid.

MK4

The Modern Render Protocol: Combating 'Red Stripe' algae on the Western Expansion.

MK5

The Village-Grid Hybrid: Soft washing for heritage stone; pure water for modern glass.

MK12

The Carbon-Crust Protocol: Steam cleaning for Victorian industrial brickwork.

MK46

The Georgian Protocol: Limestone preservation for the historic High Street.

MK18

Limestone preservation for the Great Ouse Valley.

MK9

The Skyline Protocol: High-reach access and commercial-grade restoration.

MK8

The Eco-Clad Protocol: Specialist care for timber, zinc, and mixed-material facades.

MK11

The Coaching Town Protocol: Soft washing for limestone in a high-traffic zone.

MK3

The Clay Ridge Protocol: Wind-driven rain protection for the elevated western ridge.

MK43

The Wind-Driven Protocol: Weatherproofing for the high clay ridge.

MK6

The Density Protocol: Managing airflow and algae in high-density grid squares.

MK16

Bio-film removal for the humid river confluence.

MK41

The Clay Ridge Protocol: Moss management for the northern clay slopes.

MK17

The Greensand Protocol: Iron stain removal for the pine-wood ridge.

MK1

The Brickworks Protocol: Specialist porous clay cleaning for Bletchley’s industrial heritage.

MK7

The Eastern Ridge Protocol: Exposed cleaning for the windy eastern heights.

MK2

The Canal-Side Protocol: Managing humidity and carbon in the historic brickworks zone.

MK14

The Water’s Edge Protocol: Algae control for the canal corridor.

MK45

The Acid-Soil Protocol: Managing moss and iron stains on the ridge.

MK15

The Lakeside Protocol: Spider and fly-spot management for water-side homes.

MK10

The Commuter Belt Protocol: Dust management for the M1/A421 corridor.

MK40

The Embankment Protocol: Riparian cleaning for the riverside town.

bottom of page